In the era of the energy transition, energy storage technologies have become a key driver of global sustainable energy development. As we noted in our previous post, the global energy storage market is poised for rapid growth by 2025—yet fire safety risks remain an ever-present concern. To address the challenges surrounding fire protection and related systems in overseas energy storage projects, our company has partnered with specialized international consultants and the authoritative AHJ organization, which collaborates closely with Andun. Through rigorous research and analysis, we have uncovered critical insights, laying a solid foundation for the safe and sustainable advancement of the energy storage industry.
 

 

 

Question 1

Will the TRPP system referenced in the 2026 edition of NFPA 855 be mandatory, and could we discuss its requirements?

Answer

NFPA 855 does not mandate the implementation of a TRPP system; however, local AHJs may amend regulations to require it on a project-by-project basis. Both the public and insurance companies typically require energy storage systems to be equipped with a TRPP.

 

Question 2

Tesla Mega Pack products do not comply with NFPA 855. Regarding the required system, can Chinese companies also follow this approach, and will it be recognized in the United States?

Answer

Chinese companies can obtain installation approval if they conduct the relevant tests and secure an engineering evaluation report from a U.S. fire engineer attesting to the effectiveness of their engineered system design. Section 9.6.5.6.4 of the 2023 edition of NFPA 855 permits this approach; however, Tesla’s energy storage products are not approved for installation everywhere.

 

Question 3

In North America, what type of system is generally preferred for explosion-proof systems?
 

Answer

NFPA 69 is more widely accepted; even with the fan running, residual flammable gases may remain inside the container, potentially leading to localized deflagrations. Therefore, a comprehensive explosion‑control system must be designed based on CFD modeling, specifying the type and number of flammable‑gas detectors, as well as the fan’s exhaust flow rate and installation location.

 

Question 4

Can the fire safety design scheme of an energy storage project that has already been implemented and accepted be reused in a new project?
 

Answer

Any new project must undergo a re‑review, and changing the location or the jurisdictional authority (AHJ) may yield different outcomes. 。

 

Question 5

For projects that have been delivered and are currently in operation, if the product has reached the end of its service life and needs to be replaced, can the brand be changed?
 

Answer

According to the project operations and maintenance plan and the product maintenance manual, switching brands requires a new license. 。

 

Question 6

When a gaseous fire suppression system is discharged, is it necessary to shut down the fans to maintain total flooding?
 

Answer

No, it is not necessary. When the gaseous fire suppression system discharges, a fire has already broken out inside the container. However, the United States prioritizes explosion prevention, and very few incidents result in firefighter injuries due to fires.

 

Question 7

What is the after-sales service process for energy storage projects in North America?
 

Answer

Daily maintenance shall be performed by the owner in accordance with the energy storage system’s maintenance manual. The owner may designate an after-sales service provider or a energy storage integrator to carry out all after-sales services through locally contracted entities. 。

 

Question 8

Who is responsible for developing the Emergency Response Plan?

Answer

During the project’s early stages, the energy storage integrator should coordinate with the local AHJ. To meet the AHJ’s requirements, a comprehensive emergency response plan can be developed by leveraging the resources of local fire safety and regulatory authorities. 。

 

Question 9

When will the 2026 edition of NFPA 855 be published and come into effect?

Answer

The 2023 edition of NFPA 855 was released in August 2022, and the 2026 edition is expected to be issued and implemented in August or September. Based on updates to fire codes and energy storage system standards adopted by U.S. states, it is anticipated that multiple states will begin formal implementation between 2027 and 2030.

 

Question 10

What documents are required from manufacturers for HMA‑level energy storage products?

Answer

UL 9540, UL 9540A, and all design documents for fire alarm and explosion‑control systems, BMS, TRPP, and related systems are required.