Introduction


Following the first installment of 10 Q&As, the second installment has been officially released.

Content sourced from the Roundtable Dialogue at the 2026 Electrochemical Energy Storage Safety Conference.

(To review the content of the first issue, click the blue text below.)

Energy Storage Safety and Standards: Roundtable Q&A (Part 1)

This issue continues the style of the first edition.

Focusing on the practical challenges in the implementation process.

Provide authoritative reference recommendations.


·


·












1、 GB/T 51048-2025 “Design Standard for Electrochemical Energy Storage Power Stations” 10.0.6  The ventilation system design for the energy storage battery room shall comply with the following provisions. :  The ventilation rate of the energy storage battery room shall be determined to ensure that the maximum volumetric concentration of flammable gases in the indoor air does not exceed the lower explosive limit. 25% Calculate, and the air exchange rate shall not be less than 6 Next /h The air exchange rate shall be calculated based on the total volume of the energy storage battery room. The foregoing applies only to battery rooms; can prefabricated battery modules also be subject to the aforementioned standards?

GB/T 51048-2025 “Design Standard for Electrochemical Energy Storage Power Stations” With regard to ventilation, the prescribed ventilation rate is calculated based on the total volume of the prefabricated cabin; however, GB/T 44026-2024 “Technical Specification for Prefabricated Cabin-Type Lithium-Ion Battery Energy Storage Systems” The ventilation system shall use explosion-proof fans, and its air exchange rate shall be no less than the net volume of the prefabricated cabin per minute. This requirement is stricter than… GB/T 51048-2025 “Design Standard for Electrochemical Energy Storage Power Stations” It is higher, GB/T 44026-2024 “Technical Specification for Prefabricated Cabin-Type Lithium-Ion Battery Energy Storage Systems” It is a product‑category standard; when designing products, you must meet the requirements of both standards.





2. At present, overseas exports of energy storage systems are required to undergo large-scale fire‑testing. What are the corresponding requirements in China? Will this impact domestic regulations?

Currently, National Technical Committee for Standardization of Electric Power Energy Storage Discussions are already underway regarding the initiation of a national standard for large-scale fire‑exposure testing. Sungrow and the China Academy of Electrical Sciences have submitted applications to establish this national standard, and stakeholders are encouraged to stay tuned for further developments.





3. Does the national standard specify fire‑separation requirements for the battery compartment and the electrical compartment of prefabricated cabins?

There are no explicit requirements; it relies more on product needs.





4. Will the forthcoming policies include provisions for flywheel energy storage?

GB/T 51048-2025 “Design Standard for Electrochemical Energy Storage Power Stations” It is the design standard for electrochemical energy storage and does not include provisions specific to flywheel energy storage. Flywheel energy storage is a physical energy‑storage technology, and its standards are developed by a dedicated technical committee.





5 At the design level of energy storage power stations, how is information exchange and coordinated control among the battery management system, the energy management system, the substation’s monitoring system, and the fire alarm system addressed? Currently, a widespread issue is the incompatibility of communication protocols among equipment from different manufacturers, which has resulted in “information silos” and poses challenges to the operation, maintenance, and management of energy storage facilities.

First, in terms of coordinated control, standalone electrochemical energy storage stations are typically equipped with step-up substations. The fire alarm system of the step-up substation can enable integrated, interlinked control across the substation area. As for fire protection in the energy storage system—particularly in the battery section—local rapid response is generally achieved through the station’s built-in controllers.

Second, in terms of information exchange, the primary barrier among subsystems is the lack of standardized protocols. At the design stage or during equipment procurement, it is advisable to require the BMS to integrate alarm signals from local controllers and forward them to the EMS. As for information exchange between the fire‑alarm detectors within the energy‑storage system and the station‑level fire‑control panel, this can be more challenging. Our typical approach is to mandate that the energy‑storage system’s fire‑alarm controller provide dry‑contact signals to the station‑level fire‑control panel. If the number of manufacturers supplying fire‑alarm equipment for the entire plant’s energy‑storage systems is limited, another option is to require the energy‑storage vendor to supply a station‑level fire‑control panel and install it in the fire‑control room. Although this does not fully resolve the issue of seamless information interoperability, it can nonetheless offer certain operational and maintenance conveniences.





6 , whether except GB/T 51048-2025 “Design Standard for Electrochemical Energy Storage Power Stations” The 12.4.6 Except for the four types of buildings specified, all other buildings shall be equipped with indoor fire hydrants.

With regard to the installation of indoor fire hydrants, reference should be made to the provisions of the Technical Code for Fire Water Supply and Hydrant Systems, the Code for Fire Protection Design of Buildings, and the General Provisions.





7 , (Continuing from the previous question) Standard No. 12.4.7 The provision stipulates that pre‑fabricated lithium‑ion energy storage battery modules shall be equipped with an automatic fire suppression system. The selection of the automatic fire suppression system shall be determined comprehensively based on factors such as the layout of the energy storage battery room and the battery module, as well as the characteristics of the batteries. System design shall comply with the relevant current standards, and the automatic water spray fire suppression system shall be designed in accordance with the current national standard GB 50084-2017, “Code for Design of Automatic Water Spray Fire Suppression Systems.” The prescribed severe hazard level I Level design. May I ask, when an energy storage battery cabinet is equipped with an automatic water spray fire suppression system, is its fire endurance duration determined according to...? GB 50084-2017 As stipulated in the Code for Design of Automatic Sprinkler Systems 1h or the outdoor fire hydrants specified in this standard 3h?

It should be based on 1 hour.

This is because the 3-hour requirement applies specifically to indoor and outdoor fire hydrants. In GB 50084-2017, “Code for Design of Automatic Sprinkler Systems,” the duration of automatic sprinkler operation is clearly specified as 1 hour.





8 Regarding the pre‑fabricated cabin’s built‑in water‑based fire‑suppression interface, how long should the duration of the fire‑water supply be? When calculating the required fire‑water volume, should this be combined with the outdoor fire‑hydrant flow rate specified in the relevant codes for outdoor pre‑fabricated cabins? The above discussion pertains only to battery rooms; can the same standards be applied to battery‑type pre‑fabricated cabins?

When determining the effective volume of a fire‑water tank, it should be sized based on the minimum water demand of fire hydrants, automatic sprinkler systems, and other such systems. As for the reserved fire‑fighting water‑supply connections, the code does not specify a clear requirement for the duration of continuous discharge. Our understanding is that, during the design process, we do not separately account for this additional water volume or perform any supplementary calculations. In areas with abundant water resources, the replenishing water supply can serve as an auxiliary source for the tank’s inlet, and fire‑truck water can also be used as an additional backup source. In practice, redundant provisions are generally not made.





9 , according to GB/T 51048-2025 “Design Standard for Electrochemical Energy Storage Power Stations” Requirements: The selected fire alarm system shall meet GB 50116-2013 Code for Design of Automatic Fire Alarm Systems and GB/T 42288-2022 “Safety Code for Electrochemical Energy Storage Power Stations” the requirements, and GB/T 42288-2022 “Safety Code for Electrochemical Energy Storage Power Stations” The alarm control panel must meet the requirements of GB 4717-2024 “Fire Alarm Control Panel” requirements. At present, many manufacturers’ fire alarm control panels are proprietary products and do not comply with GB 4717-2024 “Fire Alarm Control Panel” the requirements, has not obtained 3C Certification: Only a technical appraisal report has been obtained. May I ask whether the use of such products complies with the relevant standards?

Expert 1’s answer:

Fire protection products must comply with national standards or obtain a technical appraisal report; products without such certification are non‑compliant.


Expert 2’s answer:

During acceptance inspections conducted by the housing and urban–rural development authorities, the primary focus is on the standards specified in the design documents. Once these standards are clearly outlined, the inspection and acceptance process must be carried out strictly in accordance with the requirements. For example: GB/T 51048-2025 “Design Standard for Electrochemical Energy Storage Power Stations” Requirements met GB 50116-2013 Code for Design of Automatic Fire Alarm Systems The standard stipulates that the fire alarm products used therein shall comply with… GB 4717-2024 “Fire Alarm Control Panel” requirements, and must obtain the corresponding 3C certification to ensure compliance.

Additionally, as some experts have pointed out, the fire detectors currently used inside prefabricated cabins are prone to false alarms and exhibit a delay of 3 to 5 minutes—discrepancies that differ significantly from what has been observed on-site. It is well known that buildings widely employ smoke and heat detectors that meet 3C certification standards, yet there have been no reports of persistent false alarms or alarm delays. The issues described above primarily stem from the use of multi‑function detectors that do not comply with 3C certification. Although such products may obtain technical appraisal reports, these certifications are typically issued after review and approval by a panel of experts, without extensive real‑world validation. Furthermore, even if a product receives a technical appraisal report, under fire safety regulations, detectors must undergo a full inspection at least once a year; for combustible gas detectors, which rely on electrochemical sensors, calibration is required every six months.

At present, the multi‑function detectors used within battery packs of electrochemical energy storage stations must also comply with relevant standards. In practical applications, however, it can be challenging to perform regular calibration of these detectors once they are installed inside the battery pack—this is essentially a matter of choosing an appropriate technical approach. According to available information, Ji’andun Fire Protection employs a thermal‑wire detection method. As part of the fire‑extinguishing system, the thermal wire relies on temperature sensing, eliminating the possibility of false alarms and offering a service life of over ten years. Moreover, it fully meets the requirements for pack‑level detection, making it an excellent technical solution.





10. GB/T 42288-2022 “Safety Code for Electrochemical Energy Storage Power Stations” Article 6.10 stipulates that an automatic fire suppression system shall be installed in the battery compartment or battery room, whereas… GB/T 51048-2025 “Design Standard for Electrochemical Energy Storage Power Stations” The regulation only mandates that the battery room of a lithium-ion battery prefabricated module be equipped with an automatic fire suppression system. Should an automatic fire suppression system also be considered for the flow‑battery compartment?

During the design process, when encountering such issues, if the code of practice neither explicitly requires nor prohibits a particular approach, it may be adopted by analogy.