In the previous installment, we reviewed several key updates in the 2026 edition of NFPA 855, covering fundamental requirements such as energy storage system construction documentation, hazard mitigation analysis (HMA), automatic fire detection and suppression systems, and emergency power supply systems. Once alarms sound and the system activates, the ultimate test of safety design lies in effectively preventing the spread of thermal runaway.
In this issue, we will delve into the technical core of the standard and continue to break down, item by item, its provisions on fire‑exposure and explosion testing, Critical fire‑protection provisions—such as the Thermal Runaway Propagation Protection System (TRPP), mechanical exhaust ventilation, explosion control and prevention, and combustible concentration reduction (CCR) systems—have been updated. These requirements are directly tied to the inherently safe design of energy‑storage systems and constitute mandatory criteria for project approval and safe operation. Let us examine the new boundaries established by the 2026 edition of NFPA 855 to safeguard energy‑storage safety.
Translation:
9.2 Fire and Explosion Testing
9.2.1 Testing
Where required by other provisions of this standard, representative ESS units shall be subjected to UL 9540A testing and large-scale fire tests in accordance with Section 9.2, in order to determine the gas generation rate of the battery cells, the potential for thermal runaway propagation at the module level, and the likelihood of thermal runaway propagation between ESS units.
Translation:
9.3.2 Hazard Mitigation Analysis for Electrochemical Energy Storage
9.3.2.1 Existing lithium-ion ESSs that have not been certified to UL 9540 must undergo a hazard mitigation analysis in accordance with the requirements of Section 4.4.
9.3.2.2 When required by the AHJ based on the results of the hazard mitigation analysis, the lithium-ion ESS shall be upgraded with additional hazard mitigation measures.
9.3.2.3 All types of lead-acid batteries and nickel-based aqueous batteries do not require HMA.
Translation:
9.7.6.6.1 For fluid‑based supplemental and pre‑design TRPPs, the system piping and associated equipment shall comply with all applicable sections of ASME B31.1 or B31.3.
9.7.6.6.2 In accordance with 4.6.1, compliance with ASME B31.1 or B31.3 standards shall be documented as part of the UL 9540 certification.
9.7.6.6.3 The control system of the TRPP shall be a fire alarm control unit specifically listed for release‑to‑service applications.
9.7.6.6.4 The power requirements for the TRPP shall comply with the provisions of Section 4.10.
9.7.6.6.5 The TRPP shall be commissioned and documented in accordance with 9.7.4.
9.7.6.6.6 TRPPs shall be inspected and tested at least once annually.
9.7.6.6.7 The system’s effectiveness shall be documented in accordance with Section 9.2.
Translation:
9.7 Protection and Remedies.
9.7.1 Smoke and Fire Detection
Unless otherwise modified in this chapter, the ESS shall be equipped with smoke detectors, thermal‑imaging fire detectors, or radiant‑energy sensing systems that comply with NFPA 72.
Translation:
9.7.6.1.5 Mechanical exhaust ventilation.
Exhaust ventilation must be provided in accordance with the applicable mechanical codes and one of the following:
(1) Under hydrogen‑generation conditions, the exhaust ventilation rate estimated based on the amount of hydrogen produced is sufficient to limit the maximum hydrogen concentration to 1.0% of the free air volume in the room or enclosure under the worst‑case scenario, including simultaneous “boost” charging of all batteries, in compliance with nationally recognized standards.
(2) Based on an exhaust ventilation rate of no less than 1 ft³/min/ft² (5.1 L/sec/m²).
9.7.6.1.5.1 The required mechanical exhaust ventilation system must be installed in accordance with the manufacturer’s installation instructions and applicable local building, mechanical, and fire safety regulations.
9.7.6.1.5.2 The required mechanical exhaust ventilation system shall be monitored by an approved central, proprietary, or remote‑station service that complies with NFPA 72, or shall trigger audible and visual alarms at an approved, regularly manned location.
9.7.6.1.5.3 Mechanical exhaust ventilation systems and their components shall comply with the following requirements:
(1) It must be continuous, or initiated by a gas detection system compliant with 9.6.6.1.5.4.
(2) Must remain in the open position to ensure that flammable gases do not accumulate and exceed 25% of the lower flammable limit (LFL) of the flammable gas mixture.
(3)* Must be regarded as a critical safety system and comply with the requirements of Section 4.10, unless the battery technology ceases to vent when the charging power supply is lost.

9.7.6.1.5.4 When exhaust ventilation is activated in accordance with 9.7.6.1.5.3 based on gas detection, the ESS must be protected by an approved continuous gas detection system that meets the following requirements:
(1) The gas detection system shall be designed to activate the mechanical exhaust ventilation system when the detected concentration of flammable gas exceeds 25% of the lower flammable limit (LFL) of the flammable gas mixture.
(2)* The gas detection system shall be classified as a critical safety system and comply with the requirements of Section 4.10, unless the battery technology ceases venting when the charging power supply is lost.
(3) When the gas detection system fails, a fault signal shall be transmitted to an approved central station, proprietary station, or remote station that complies with NFPA 72, or to an approved location that is regularly staffed.
Translation:
9.7.6.7 Explosion Control and Prevention
9.7.6.7.1 In addition to the other requirements of this standard, explosion control and prevention shall comply with the provisions of this section.
9.7.6.7.1.1. If a flammability hazard study has been submitted to the AHJ demonstrating that combustible gas concentrations cannot accumulate and, on average, exceed 25% of the LFL, then explosion control and prevention are not required.
9.7.6.7.1.2 All types of lead-acid batteries and flooded nickel‑cadmium batteries are exempt from explosion control and prevention requirements.
9.7.6.7.2 Measures to prevent the release of flammable gases during normal operation shall comply with the provisions of 9.7.6.1.
9.7.6.7.3 All ESSs shall be equipped with a reliable explosion control and prevention system, the design, installation, operation, maintenance, and testing of which shall comply with NFPA 69.
9.7.6.7.3.1 A partial-volume deflagration assessment shall be conducted in accordance with NFPA 68.
9.7.6.7.3.2 The design of explosion control and prevention systems shall be based on the gas composition and volume determined by the tests conducted in accordance with Section 9.2.
9.7.6.7.3.3 With approval, ESS that have been verified through installation‑level fire and explosion testing and engineering assessments conducted by a registered professional designer in accordance with Section 9.2—including cabinet‑level verification—may be used to ensure that no hazardous pressure waves, debris, fragments, or enclosure fragments are ejected, thereby substituting for the provision of explosion control and prevention measures compliant with NFPA 69.
9.7.6.7.3.4 Independent ESS enclosures installed in larger ESS configurations—such as rooms, buildings, or containers—shall be designed to ensure that, during testing in accordance with the requirements of Section 9.2, no explosive gases or projectiles are emitted, either from the ESS enclosure itself or from its installation space.
Translation:
9.7.6.7.4 Combustible Concentration Reduction (CCR) System
The CCR system shall be suitable for its intended use and for the temperatures it may be exposed to during a thermal runaway event.
9.7.6.7.4.1 CCR System Performance
(A) If the ESS includes a suppression system other than water-based, the detection, logic solver, and discharge sequence shall not impair the performance of the CCR system.
(B) Impact analysis and performance data shall be provided to the AHJ.
9.7.6.7.4.2. CCR System Startup
(A) When gas detection is used to initiate a combustible concentration reduction system (CCR system), in accordance with NFPA 69, the enclosure containing the ESS must be protected by a certified continuous gas detection system that meets the following requirements:
(1) The gas detection system shall be designed to activate the CCR system upon detection of flammable gas, with the concentration not exceeding 10% of the lower flammability limit of the gas mixture.
(2) The CCR system must remain operational to ensure that flammable gases do not accumulate and exceed 25% of the lower flammable limit (LFL) for the gas mixture or for any individual flammable component.
(3) The CCR system and its components shall be regarded as critical safety systems and shall comply with the requirements set forth in Section 4.10.
(4) The gas detection system and the CCR system shall trigger an alarm at the monitoring station.
(B) Except for gas detection, other technologies used to detect, alert, and activate the CCR system shall be evaluated by a registered professional designer with fire‑protection experience in accordance with the HMA.