“Energy Storage Fire Protection: Global Regulatory Updates” – China Edition: National Standards Upgraded, Automatic Fire Suppression Systems Now Standard Equipment
Author:
The year 2026 marks a pivotal moment as the 14th Five-Year Plan draws to a close and preliminary research for the 15th Five-Year Plan gains momentum, with local authorities progressively tightening safety standards for energy storage. The revised GB/T 51048-2025, “Design Standard for Electrochemical Energy Storage Power Stations,” will officially come into effect on April 1. Its promulgation signals comprehensive regulatory oversight of electrochemical energy storage power stations and establishes standardized requirements for their construction. This article provides a detailed analysis, starting with the most stringent changes introduced by the new regulations.
Compared with the previous version 51048, the new version 51048 sets forth clear requirements regarding site‑selection red lines, prefabricated cabin layout, indoor battery cabinets, fire‑extinguishing systems, and other aspects, as follows:
① Site Selection Red Line:
Previous version: No underground or rooftop restrictions.
New version: Lithium/Sodium battery plant, prefabricated module Construction underground is strictly prohibited. / Semi-underground / Roof ; It shall not be located in densely populated areas or in office/residential zones.
②Prefabricated Cabin Layout:
Old version: No adjacency / Double-layer rule.
New version: Single-layer construction is recommended; if two layers are absolutely necessary, they must meet the following requirements: independent support, fire resistance of at least 3 hours, and a total adjacent area of no more than 25 square meters for the two layers.
③ Indoor battery cabinet:
Previous version: Height unrestricted; clear passage width ≥ 1200 mm.
New version: Height ≤ 2400 mm; cabinet side clearance width ≥ 800 mm; distance from the front of the cabinet to the wall ≥ 1600 mm.
④ Fire suppression system: The new version requires lithium/sodium battery rooms and prefabricated cabins. An automatic fire suppression system is required. , the alarm system shall be interlocked with the ventilation and air-conditioning systems, and the design shall comply with Relevant Current Standards The provisions.
Taking most of the currently designed gas fire‑extinguishing systems as an example, the design of the detection and alarm system shall be carried out in strict accordance with GB 50116‑2013 “Code for Design of Automatic Fire Alarm Systems,” with the following requirements:
1. Selection of fire detectors:
2. Logical requirements for the gaseous fire suppression system:
3. Interlock Control Requirements:
4. System Selection: The gaseous fire suppression system shall be designed in accordance with GB 50370-2005, “Code for Design of Gaseous Fire Suppression Systems.” Under this standard, only three types of gaseous fire suppression systems are specified: aerosol-based pre‑action fire suppression systems, heptafluoropropane fire suppression systems, and IG‑541 mixed‑gas fire suppression systems.
As for the highly popular perfluorohexanone fire suppression system, there are currently no national product, design, or acceptance standards. In accordance with Ministry of Housing and Urban–Rural Development Order No. 58, the following documentation is to be prepared:
5. Water-based fire protection requirements: According to the requirements of GB/T 51048-2025, “Design Standard for Electrochemical Energy Storage Power Stations,” when a gaseous fire suppression system is employed, dry piping shall be installed to deliver fire‑fighting water or other liquid extinguishing agents into battery rooms and prefabricated battery cabins.
6. Zoning requirements for the automatic fire alarm system: According to the requirements of GB/T 51048-2025, “Design Standard for Electrochemical Energy Storage Power Stations,” detection equipment shall cover not only the battery compartment within the prefabricated energy storage module but also the electrical compartment.
7. Explosion-proof ventilation requirements: Although the standard currently does not specify explosion‑proof requirements for detection, alarm, and fire‑extinguishing equipment, energy‑storage battery compartments still pose an explosion risk; therefore, such devices—including detectors, fire‑extinguishing systems, and ventilation equipment—must all be explosion‑proof. The interlock requirements between combustible‑gas detectors and ventilation systems are as follows.


8. Minimum Protection Unit Requirements: According to the requirements of GB/T 42288 and GB/T 44026, the minimum protective unit should be a battery module.

Overall, the GB/T 51048-2025 “Design Standard for Electrochemical Energy Storage Power Stations” repeatedly emphasizes that “relevant current standards must be complied with.” Therefore, to meet its requirements, the most critical factor is ensuring full compliance. Only by designing, constructing, and commissioning in accordance with the law can the construction and development of electrochemical energy storage power stations be truly standardized.